Why does Lukas floats through the air, how do you get from design to construction and what are the defining Croatian elements in the new themed area?

  • 19:14 Minutes
  • Documentaries
  • FULL HD
MACK Media

Winner of the ‘Best of Content Marketing Award 2023’ in Gold

A lot has happened on the construction site - to get an update on Voltron Nevera powered by Rimac, Patrick Marx and Lukas Metzger speak to several people in charge. Site manager Julien Lauffenburger from MACK Solutions confirms that the shell construction of the rollercoaster station building is almost finished. Now, it’s onto the next big step: Implementing the designs for the Croatian themed area. Matthias Lange, Head of Design Development, has an overview of the theming around the multi launch coaster.

The designs created by Matthias and his team are turned into reality by MACK Solutions. Patrick talks to Christof Zimmermann about the process in detail. Working with Miriam Mack is particularly valuable. The half-Croatian is a good judge of which building materials and designs are typically Croatian and which are not.

At the end of this episode of the construction documentary, David Studer tells Lukas about the next steps on the site. 

Published on: 27.04.2023

Recommendations